Sign In | Join Free | My uabig.com
China FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD. logo
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD
Active Member

7 Years

Home > Automatic Climbing Formwork >

Hydraulic Automatic Climbing Formwork Easy Operation For High Pier Construction

FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
Contact Now

Hydraulic Automatic Climbing Formwork Easy Operation For High Pier Construction

  • 1
  • 2

Brand Name : ForPro

Model Number : SCF60

Certification : ISO and CE

Place of Origin : Shanghai

MOQ : 20 PIN

Price : $6000-6500/PIN

Payment Terms : L/C, T/T

Supply Ability : 10000 PIN/Year

Delivery Time : 30-45 Work days

Packaging Details : Pallet

Material : Q235 Steel,Hot galvanizing, wood,PP Plastic,Timber Beam H20

Color : Green,Blue,Yellow,customized

Application : Concrete Construction,Dam,Pier,bridge,Tall building

Size : Project Drawing,Standard or customized

Surface : Galvanized

Sample : Welcome,Free

Contact Now

Bridge Pylon and High Pier Construction Hydraulic Self Climbing Formwork Technology

Product introduction

The power of the auto-climbing formwork comes from the hydraulic system which includes pump station, hydraulic cylinder and oil pipe . The hydraulic system can control the climbing of the climbing rail and the bracket. As a result, the climbing rail and the bracket can climb up alternatively with the assistance of hydraulic system. The whole system will climb up steadily. Cranes are not needed during the construction. Formwork operation is easy, highly efficient and safe. It can climb up both vertically and slantwise, therefore it is the best choice for the construction for high rise buildings and other vertical structures.

Working and climbing procedure

Hydraulic Automatic Climbing Formwork Easy Operation For High Pier Construction

Component

1.ForPro large size timber beam formwork

Include high quality plywood/Timber beam/steel waler/walerclamp/lifting bracket.

2.Climbing bracket

Include Horizontal bracket/ vertical profile/ diagonal strut/ vertical Waling/ panel/travelling unit/suspension platform/top platform/ Walerhook bolt.

3.Self climber

Include guiding rail /lifting device/suspensionshoe/suspension bolt/safety pin/supporting carriage

4.Hydraulic system

Include hydraulic cylinder, hydraulic oil line, hydraulic hose connector and hydraulic unit

5.Anchoringsystem: High strength screw/ climbing cone/ position cone/ embedded anchor rod/sealing sleeve

Technical Specification

No. Technical Specification
1 Max. pouring height can reach to 6m;
2 Max. lifting capacity reach to 60KN;
3 Climbing speed can reach to 0.2m/min;
4 Main platform width up to 2.5m, provides sufficient space for formwork retraction up to 750mm and easy for formwork cleaning;
5 Min. concrete strength requirement of anchor point is 15KN in working situation;
6 6 levels of working platform provide oriented work space for formwork operation, reinforcement installation, concrete pouring and concrete finishing repair etc.

Applications

1.Bridge pier and pylon

2.LNG tank project

3.Super High-rise Building

4.Tower project

Our Services
1. Analysis of the initial stage, and provide professional advice, consultation and formwork planning.
2. Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
3. Choose a best propasal to help our clients to bid for the project.
4. Start to devise the formwork detailedly according to the winning bidding.
5. Provide the layout and assembly of the formwork, gives on-site advice and continuous support service.


Product Tags:

self climbing system

      

automatic climbing system

      
Wholesale Hydraulic Automatic Climbing Formwork Easy Operation For High Pier Construction from china suppliers

Hydraulic Automatic Climbing Formwork Easy Operation For High Pier Construction Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: FORPRO FORMWORK TECHNOLOGY (SHANGHAI) CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)